EPOX 305 is epoxy based, two component, solvent-free, fluid, anchoring and adhesive mortar.
Fastening iron of masonry structure on concrete.
Binding the connect old and new concrete.
To stabilize rail, machine, studs.
To installation bolt and pins.
Used as adhesive mortar for bonding metal parts to the surface.
Has excellent adhesion property. Provides excellent bonding between old and new structures.
Protects steel against corrosion.
Improves mechanical strength.
Solvent-free.
Content Color Density Compressive Strength Flexural Strength Adhesion Resistance Pot Life Temperature Resistance Application Temperature Full Curing HS Code | Component A: Epoxy Resin Component B: Epoxy Hardness Grey 1,7 g/cm3 30 N/mm2 (1 day) 75 N/mm2 (7 days) 17 N/mm2 (1 day) 25 N/mm2 (7 days) 3 N/mm2 (on concrete) 3,5 N/mm2 (on steel) 40 minutes -15°C to +90°C +10°C to +20°C 7 days 3214.10.90.00.00 |
Preparation of Substrate
Application surface must be dry, clean and clean off materials which prevent bonding, such as dust, oil, rust and remove loose pieces. Cracks and pores must be repaired with suitable repair mortar.
Application Method
Component A and B is stirred separately under low speed mixer, then Component B is slowly poured into Component A under the low speed mixer and continue mixing until obtaining a homogenous mixture without any agglomerate (approximately 3-4 minutes).
For fresh concrete applied on old concrete; Mixture should be applied on old concrete with a brush or roller. Depending on weather conditions, after curing in 5-40 minutes, fresh concrete is applied on it.
For anchoring applications; Oil, moisture and adherence reducing agents must be removed from the holes. EPOX 305 should be filled into holes up to 2/3 of their depths by using mortar gun and iron should be placed in the hole by rotating clockwise. After that the mortar must overflow from the edges, otherwise, more mortar should be added in to the hole. In vertical anchorage applications at least 6 mm larger diameter drill bit than reinforcement should be used to open holes at desired depth. Holes should be cleaned appropriately and anchoring
bars should be placed by turning.
For general purpose bonding applications; EPOX 305 should be applied to each of the parts to be glued. Then the parts should be bonded to each other by pressing them. Do not move them until they are completely dry.
The mixture must be consumed within 30 minutes; later it cannot be applied due to jelling. Fully curing is done minimum 7 days. Application temperature should be between + 10°C to + 30°C. It is not recommended to apply on frost, windy and rainy days.
1,45 kg/m2/mm. Recommended application thickness is min. 2 mm / max. 30 mm.
A component: 3,75 kg + B component: 1,25 kg = 5 kg set
12 months in original, unopened package.
Store in dry area between +5°C and +35°C. Protect from heat, freezing and direct sunlight.
Clean tools and equipment with water immediately after use. Dried material can only be removed mechanically.