EPOX 310 is an epoxy based, 3 component, solvent free repairing and filling mortar with contain special aggregate.
- In industrial floors, crane rail and airport concrete runaways.
- To repairing highway joints.
- The maintenance and repair of marine structures.
- Bridge bearings and filling the empty space between the steel reinforcement of reinforced concrete columns.
- To repairing surface before epoxy and polyurethane floor coating applications.
- Repair works of reinforced concrete elements.
- Excellent adhesion on concrete and steel.
- Solvent free.
- Excellent abrasion and impact resistance.
- Excellent mechanical and chemical resistance.
- Can be applied without primer.
Content Color Compressive Strength (TS EN 196) Flexural Strength (TD EN 1969 Adhesion Resistance Application Substrate Temperature Service Temperature Pot Life Drying Time Pedestrian traffic Full curing HS Code | Component A : Epoxy Resin Component B : Epoxy Hardener Component C : Special graded quartz aggregate Grey >35 N/mm2 (1 day) >80 N/mm2 (7 days) >20 N/mm2 (1 days) >30 N/mm2 (7 days) >2 N/mm2 (on concrete) >3 N/mm2 (on steel) +5°C to +80°C -15°C to +80°C 30 minutes 24 hours 7 days 3214.10.90.00.00 |
Preparation of Substrate
Application surface must be dry, clean and clean off materials which prevent bonding, such as dust, oil, rust and remove loose pieces. Appropriate BAUMERK primers should be applied before the application if needed.
Application Method
Component A and B are mixed under low speed mixer for 3-4 minutes, then component C is poured into the mixture and all of them mix for 3-5 minutes until obtaining homogenous mixture. Mixture must be applied in 60 minutes. Mixture should be applied on the surface with using a trowel as obtained maximum 50 mm thickness. Depending on the weather conditions 10-48 hours should be waited before layers. The product would be completely cured in minimum 7 days. During the application, ambient and surface temperatures should be between +10°C and +30°C. It is not recommended to application on rainy, windy and frost days. After application, the material should be protected from direct contact with water for a minimum of 24 hours.
1,70 kg/m2 for 1 mm thickness. Recommended application thickness is min. 4 mm / max. 50 mm.
A component: 1,66 kg + B component: 0,86kg + C component: 17,51 kg = 20 kg set
18 months in original, unopened package.
Store in dry area between +5°C and +35°C. Protect from heat, freezing and direct sunlight.
Clean tools and equipment with industrial type solvents immediately after use. Dried material can only be removed mechanically.