EPOX 311 is an epoxy based, two component, adherence bridge between old and new concrete, solvent free adhesive.
Concrete, natural stone, brick, wood, steel and metal surface,
Adhesion between old and new concrete,
Stabilizing the windows and doors,
Bonding ceramic, tiles, granites on surfaces.
Excellent adhesion on concrete and steel.
Solvent free.
Has high load carrying capacity.
Excellent mechanical and chemical resistance.
Can be applied without primer.
Cannot be affected instant temperature changes.
Content Color Mixture Density Solid Content Viscosity Compressive Strength (TS EN 196) Flexural Strength (TS EN 196) Tensile Strength (BS 6319-7) Elasticity Modulus (TS EN 13412) Adhesion Resistance Application/Substrate Temperature Service Temperature Pot Life Drying Time Fresh concrete pouring Full curing HS Code | Component A: Epoxy Resin Component B: Epoxy Hardener Grey-Fume 1,55 g/cm3 100% 8500 cps >50 N/mm2 (1 day) >80 N/mm2 (7 days) >20 N/mm2 (1 day) >30 N/mm2 (7 days) >20 N/mm2 (1 day) >30 N/mm2 (7 days) >5000 N/mm2 (28 days) >3 N/mm2 (on concrete) (7 days) >3,5 N/mm2 (on steel) (7 days) +10°C to +30°C -30°C to +80°C 60 minutes Min 5 min / Max 40 min 7 days 3214.10.90.00.00 |
Preparation of Substrate
Application surface must be dry, sound, fully cured, clean and clean off materials which prevent bonding, such as dust, oil, rust and remove loose pieces. Surface must be roughened mechanically by blasting, milling or sanding before application.
Application Method
Component A and B are stirred separately under low speed mixer, then Component B is poured into the Component A and mixed together for 3-4 minutes until obtaining homogenous mixture. Mixture must be applied in 30 minutes. Mixture should be applied on the surface with using a trowel or spatula as 0,5 - 1 mm thickness. Parts should to be bonded to each other by pressing them and waited stably until curing the adhesive. The product would be completely cured in minimum 7 days. During the application, ambient and surface temperatures should be between +10°C and +30°C. It is not recommended to application on rainy, windy and frost days. After application, the material should be protected from direct contact with water for a minimum 24 hours.
0,60 kg/m2. Recommended coating thickness is min. 0,5 mm / max. 30 mm.
A component: 5 kg + B component: 2,5 kg = 7,5 kg set
18 months in original, unopened package.
Store in dry area between +5°C and +35°C. Protect from heat, freezing and direct sunlight.
Clean tools and equipment with industrial type solvents immediately after use. Dried material can only be removed mechanically.